IndustriesIndustry file / 12

Fencing contractor CRM software

Measure perimeters with AI, quote per linear foot with your material pricebook (wood, vinyl, chain link), schedule installs and collect on completion.

Measure perimeter, quote per LF and schedule installs.

Your Olynx kit

The 4 tools a fencing business uses every day.

Tap any tool to see its pain, capabilities, real-world scenario and metric.

Pick an area
Tool · 01TakeoffView.tsx

Satellite perimeter take-off

The pain

Walking 1/4-acre perimeter with tape = 30-45 min through mud, dogs and nosy neighbors. Miscalc by 8 LF = run short on the job or leftover material you lose. And you never calculated correct slope on the sloped backyard.

What Olynx does

Olynx traces perimeter on satellite and calculates total LF with marked vertices (auto corner count), gates marked separately (single, double, walk-thru), auto post count per material spacing (8ft for wood, 6ft for chain link), slope adder for elevation change >5°, and material by type (wood, vinyl, chain link, aluminum, ornamental iron).

  • Total LF with marked vertices (auto corner count)
  • Gates marked separately (single, double, walk-thru)
  • Auto post count per material spacing
  • Slope adder for elevation change >5°
  • Material by type (wood, vinyl, chain link, aluminum)
Killer moment

Mrs. López wants wood privacy fence in backyard. Trace perimeter: 240 LF, 6 corners, 2 gates. 6ft cedar @ $48/LF = $11,520 + posts + gates = $13,840. Signs + pays $4,152 deposit in 8 min.

30 min

saved vs measuring tape

Your complete kit

Every tool that moves your business.

Every tool built for the real-world problems a fencing business faces. No add-ons, no upsells.

Want to dig deeper into every tool?

See all features
Before Olynx

What a fencing business deals with every day.

  • Walking the perimeter with tape — slow, dirty and imprecise.

  • Mixing material types without a clean per-LF pricebook.

  • Subbing the install without coordinating on-site materials.

  • HOA approval of fence style with no tracking of who approved what.

  • Material delivered to the wrong street — crew waits 2 hours.

  • Terrain slope not measured — fence looks crooked at the end.

With Olynx

How we fix it.

8 concrete things that change the day-to-day.

  1. 01

    Perimeter take-off: trace the perimeter on the map, get LF + gates + corners.

  2. 02

    Pricebook per material (wood, vinyl, chain link, aluminum) with LF + gate + post.

  3. 03

    Material coordination: PO linked to the job.

  4. 04

    Schedule with crew assignment + material delivery.

  5. 05

    HOA approval log with style photo + board signature.

  6. 06

    Supplier PO with exact jobsite address (not the office).

  7. 07

    Slope adder calculated by elevation change on perimeter.

  8. 08

    Photo evidence of existing perimeter + property line stakes.

What changes

The numbers that move your business.

01

30 min

saved per quote

Satellite take-off vs measuring tape.

02

−$340

/job in crew idle

Material delivery synced with crew.

03

0 días

from close to $0

Balance pay link at close with photo.

04

0

HOA confusions

Approval workflow embedded.

A day with Olynx

What a Tuesday running on Olynx looks like.

  1. 07:00

    Material delivery sync

    Lumber yard reports 90-min delay. Olynx auto-reschedules crew for 9:30 a.m. Zero idle.

  2. 09:30

    New inspection

    Mrs. López backyard. Take-off 240 LF perimeter + 2 gates + 6 corners. Quote $13,840 in 8 min.

  3. 11:15

    HOA approval check

    Mr. Wong HOA board approves the style. Status in Olynx flips to "approved". Crew scheduled Saturday.

  4. 14:00

    Install progress

    Crew on Patel job: 60% complete. Uploads before/after photos to customer. Customer happy.

  5. 15:30

    Close + balance

    López job closes. 18 final photos + $9,688 invoice by SMS. Mrs. López pays in 90 sec.

5+

Specific features

14

Industries supported

$249/mo

Single Founders price

FAQ

What fencing contractors ask most.

  • Yes. You trace the perimeter and Olynx calculates LF, gates and corners automatically.

  • Yes. Commercial runs as a project with phases (demo, install, finishing); residential runs as a simple job.

  • Yes. You issue the PO with your pricebook and send it to the supplier by email — the PO links to the job.

Ready to scale?

Join thousands of service professionals who use Olynx to grow and manage their operations without the growing pains.

Locked rate for life$2,000 website includedCancel anytime