+1.5 jobs
/day with optimized route
GPS-optimized multi-job schedule
Monday mix 30-min touch-up with 4-hr drywall in no logical order. Drive 75 unnecessary miles. Late to 4th job and customer cancels. Lose 2 jobs/day from bad sequencing + 1 furious customer from delay.
Olynx orders route by GPS proximity + estimated per-task duration (flat-rate ships with time) with 15-min between-job buffer. Drag-to-reschedule when a job runs long. Auto SMS to next customer: "running 20 min behind". Real time measured vs estimated to improve future quotes.
- Per-task estimated duration (flat-rate ships with time)
- GPS-optimized route + 15-min buffer between jobs
- Drag-to-reschedule if a job runs long
- SMS to next customer: "running 20 min behind"
- Real time measured vs estimated to improve future quotes
Monday 7 a.m. 6 jobs in Frisco/Plano. Olynx orders: paint touch-up 9 a.m. (45 min), faucet swap 10:15 (60 min), drywall patch 11:45 (90 min), lunch, etc. Finish by 4:20 p.m. with all jobs done.



